Assignment Document

SurfaceTreatment[1],Platesand Supports[1] Firmware and Packaging

Pages:

Preview:


  • "SurfaceTreatment[1],Platesand Supports[1] Firmware and Packaging andAutoSoftware 20 hrs Tue 3/17 Thu 3/19 8 DeliveryScheduledInstallation Costs[1],TechniciansAuto Mon Testing 16 hrs Fri 3/20 9 Project LeaderScheduled 3/23Table 2. Task Table in MS Pr..

Preview Container:


  • "SurfaceTreatment[1],Platesand Supports[1] Firmware and Packaging andAutoSoftware 20 hrs Tue 3/17 Thu 3/19 8 DeliveryScheduledInstallation Costs[1],TechniciansAuto Mon Testing 16 hrs Fri 3/20 9 Project LeaderScheduled 3/23Table 2. Task Table in MS Project The scheduling of tasks and Gantt chart are developed by using the MS Project software.It is a project management tool to estimate the duration and overall budget of the project atbeginning. The below screenshot shows the task table in MS Project.Fig 3. Gantt chart with Task TableThe Gantt chart for the above tasks and duration is showed in below. The MS Projectsoftware is used to draw the chart automatically by providing the tasks in thetable(www.calstatela.edu, 2017). Fig 4. Gantt chartThe above Gantt chart displays the duration of the task with the resource name on eachtask. The resource table is showed in below. The table contains the human resources and non- human resources(www.calstatela.edu, 2017). Material Max.Resource Name Type Initials Group Std. Rate Ovt. RateLabel UnitsProject Leader Work P 100% 50.00 €/hr 55.00 €/hr CAD Designer Work C 100% 50.00 €/hr 55.00 €/hr Head of TechnicalWork H 100% 50.00 €/hr 55.00 €/hrOfficeTechnicians Work T 100% 50.00 €/hr 55.00 €/hr CAN ElectronicMaterial C 500.00 €BoardMetal Box Material M 300.00 € Plates and Material P 100.00 €SupportsHarness andMaterial H 200.00 €WiringDzus Screws andMaterial D 200.00 €BoltsExternalconsultant for Material E 300.00 € Panel MountingPainting andMaterial P 50.00 €Surface TreatmentPackaging andMaterial P 100.00 €Delivery CostsTable 3. Resource Table6. Cost Breakdown StructureIn this military flight simulator construction project, the cost related activities are asfollows:? Complete Diagrams, Feasibility Study and 3D Models? Configuration of Electric Board? Document for Test Procedure Specification? Purchase Components and PCB? Preparing User Maintenance Manual? Deal with Suppliers? Assemble of Panels and Link all Electrical Connections? Firmware and Software Installation? Testing "

Related Documents

Start searching more documents, lectures and notes - A complete study guide!
More than 25,19,89,788+ documents are uploaded!

Why US?

Because we aim to spread high-quality education or digital products, thus our services are used worldwide.
Few Reasons to Build Trust with Students.

128+

Countries

24x7

Hours of Working

89.2 %

Customer Retention

9521+

Experts Team

7+

Years of Business

9,67,789 +

Solved Problems

Search Solved Classroom Assignments & Textbook Solutions

A huge collection of quality study resources. More than 18,98,789 solved problems, classroom assignments, textbooks solutions.

Scroll to Top